← Back to Index
4k7 (hoihu)ECADConfidence: Medium

JLCPCB could not place two SMD electrolytics: pads were chip-style strips as tall as the can, and one part was a 6.3 mm can on pads for an 8 mm one, and the stock check had flagged both by package name but similar-looking names made it easy to dismiss.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 26-27 2026 (Oct 26 12:41 PM ET through Oct 27 7:41 AM ET digests plus the Haitch editions). Verified live 2026-10-27: issue/PR/thread read; title and state confirmed.