proveskit flight_controller_board (KiCad design)ECADConfidence: Low

Firmware and schematic agree that one output drives the heater and another fires the Deploy 2 pyro charge, but the PCB swaps OUT3 and OUT4. A heater command would energize the pyro output, and neither ERC nor the netlist flags the swap.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$18,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $18k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok Haitch pain-radar compilation, finding 218, found 2026-09-14, score 8/10. Low confidence on frequency; severity is the reason for inclusion. Cost model assumes a full schematic-to-PCB pin audit once the class is known.