← Back to Index
apriltag-processor (MurderBot1)ECADConfidence: Medium

DRC showed 10 unconnected items because the router assumed a pad plus via connected to the plus 3V3 pour on In2, but the BGA via lattice had cut the pour into islands, leaving RP2350 and FPGA pins floating.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 1-2 2026 (Nov 1 8:41 AM ET through Nov 2 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-02: issue/PR read; title and state confirmed.