Before this PR, about 50 deliberate mutations from the analysis and two reviews passed the build, including a CPL turned 180 degrees, a mirrored plate, a swapped resistor value, a missing DXF hole and knob variants all built alike. Now the checks read the BOM and CPL CSVs that actually get uploaded to JLCPCB, and they measure holes on the built solids, so all of those mutations fail the build now. The production files did not change.
Wrong verdict reported against avionics-panel (saschagrunert)
What engineers report
A wrong verdict reported against avionics-panel (saschagrunert): a check, review or gate reports pass or fail incorrectly.
Recorded mode: agent / false pass
Analyst note
From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to avionics-panel (saschagrunert).
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.