A hosted run exported Gerbers, BOM and CPL and got a real Sigstore signature, then the import returned HTTP 422 and the outer job stayed green because of continue-on-error. The verifier compared the signer's commit to the reviewed PR commit, and those are different commits by design. The board was ready and the record said it was not.

Wrong verdict reported against boardreadyops (oaslananka)

boardreadyops (oaslananka)Electronics & PCBWrong verdictMedium confidence

What engineers report

A wrong verdict reported against boardreadyops (oaslananka): a check, review or gate reports pass or fail incorrectly.

Recorded mode: validation / false pass

Analyst note

From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to boardreadyops (oaslananka).

Evidence

  1. 1oaslananka/boardreadyops PR #1521: fix(release): verify protected signer SHA separately from reviewed CAD sourcegithub.com

More recurring errors in boardreadyops (oaslananka)

See all 17 boardreadyops (oaslananka) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.