Checking the rev 2 cable against Molex's drawings showed the 50 mm FFC ribbon did not fit, so it became a custom flex jumper. Along the way a connector pad sat 0.21 mm from a socket tab (now 0.6 mm), and F1's top-side solder joint sat under the other connector, which the placement check missed until it learned to compare pad copper against the opposite face's courtyards.

Wrong verdict reported against compose-keyboards (edulpn)

compose-keyboards (edulpn)Electronics & PCBWrong verdictMedium confidence

What engineers report

A wrong verdict reported against compose-keyboards (edulpn): a check, review or gate reports pass or fail incorrectly.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 8-9 2026 (Nov 8 8:41 AM ET through Nov 9 6:41 AM ET digests plus the Haitch editions). Verified live 2026-11-09: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to compose-keyboards (edulpn).

Evidence

  1. 1edulpn/compose-keyboards PR #2: Rev 2: flex jumpers, layout-independent controller, datasheet checks, assembly rendersgithub.com

More recurring errors in compose-keyboards (edulpn)

See all 3 compose-keyboards (edulpn) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.