copperhead (copperheadhq)ECADConfidence: Medium

The agent's finish gate wanted zero ERC and DRC violations. On LibreSolar's BMS C1, an imported board with 368 ERC findings and 168 DRC findings, the requested rename ended "stalled" and was rolled back. The fix records ERC and DRC before the first edit and only fails on findings the run added. Any agent working on a real, inherited design needs to know what the design looked like before it touched it.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.