The published 92.33% efficiency uses 100 A losses extrapolated from a 95 A point by current squared. The port difference is about 11.0 W, and the summed model losses come to about 12.35 W, so the books do not close, and the reviewer says plainly the number is an estimate, not a hardware or closed simulation result.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.