← Back to Index
CZY (czy0126)ECADConfidence: Medium

A 100 A power board netlist check returned a misleading ok=True. It now says readiness PARTIAL_PASS and manufacturing_ready false, and refuses to close the gate on a new magnetics refdes whose physical pins and dot are not verified. The same PR fixes an output-path loss calc that treated the worst local 1.188 mOhm branch as the whole 100 A path, giving 13.33 W instead of about 1.35 to 2.8 W across four 25 A groups. About 39 MPNs/values are still missing.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 31-Nov 1 2026 (Oct 31 9:41 PM ET through Nov 1 7:41 AM ET digests plus the Haitch overnight edition). Verified live 2026-11-01: issue/PR read; title and state confirmed.