The easyeda2kicad footprint for the DRV8874PWPR (LCSC C1855818) comes in with unnamed thermal vias that have paste and mask open. Before layout they have to be tied to the GND pad, tented or plugged, and the paste openings removed by hand. Imported library data carries fab problems in with it. Same failure as the feastorg heatsink-paste-over-vias finding on Nov 21.
Import, export & interop reported against drill-controller (Gherkin)
What engineers report
A import, export & interop reported against drill-controller (Gherkin): breaks when reading, writing or converting files and data between tools.
Recorded mode: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 21-22 2026 (Nov 21 8:41 PM ET through Nov 22 7:41 AM ET digests). Verified live 2026-11-22: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to drill-controller (Gherkin).
Evidence
More recurring errors in drill-controller (Gherkin)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.