← Back to Index
edakit (tgd1975)ECADConfidence: Medium

On a single-sided board with five 0 ohm bridges, the checker raised two errors that are both false: a pull-up and the V_LED decoupling caps reach their nets only through the bridges, and the checker treats each bridge as a break; the simulator divides by the resistor value, so a 0 ohm part crashes it with ZeroDivisionError.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digest, Oct 25-26 2026 (Oct 25 daytime to Oct 26 morning slots). Verified live 2026-10-26: issue/PR read on GitHub; title and state confirmed.