The plan check uses part boxes that include silkscreen, so on an 84-part board it reports 19 overlaps; 17 are SMD pairs whose printed outlines touch by 0.03 to 0.44 mm while pads and bodies are well apart.

Wrong verdict reported against edakit (tgd1975)

edakit (tgd1975)Electronics & PCBWrong verdictMedium confidence

What engineers report

A wrong verdict reported against edakit (tgd1975): a check, review or gate reports pass or fail incorrectly.

Recorded mode: agent / verification gap

Analyst note

From the Grok pain-radar digest, Oct 25-26 2026 (Oct 25 daytime to Oct 26 morning slots). Verified live 2026-10-26: issue/PR read on GitHub; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to edakit (tgd1975).

Evidence

  1. 1tgd1975/edakit Issue #15: Feature proposal: part boxes may overlap by a silkscreen tolerancegithub.com

More recurring errors in edakit (tgd1975)

See all 33 edakit (tgd1975) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.