FIRM-KiCad (NCSU-High-Powered-Rocketry-Club)ECADConfidence: Medium

"Radio schematic is not up to date, need to switch radio from E22-900MM22S to E22-400MM22S and check for capacitance, inductance, size, etc." Same failure as last hour's balloon tracker, a radio swap the schematic hasn't caught up with.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.