← Back to Index
flipper-ssh-runner (SeanChangX)ECADConfidence: Medium

A 4-layer KiCad 10 board generated, placed and routed by scripts in a pinned container, with Gerbers, BOM and CPL for JLCPCB. Erratum E1 says the reverse-mount LED holes are too small for the specified LEDs. The workaround is to leave D103 and D201 out of assembly and hand-fit a different Dialight part, with the footprint fixed in rev 0.2. Scripted layout still didn't check the footprint against the part it was supposed to hold.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.