← Back to Index
hive-hwde (Hive-RSI-Lab)ECADConfidence: Medium

Altium, Allegro and PADS ship ODB++ or IPC-2581 next to Gerbers, and fabs like Eurocircuits, PCBWay and AISLER run CAM on that package directly. hive-hwde can export both, but its check_odb only checks that every reference designator is present, and nothing compares the package to the Gerbers, so a Gerber regenerated after a track move with a stale ODB++ would go out as two deliverables that disagree.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 31-Nov 1 2026 (Oct 31 9:41 PM ET through Nov 1 7:41 AM ET digests plus the Haitch overnight edition). Verified live 2026-11-01: issue/PR read; title and state confirmed.