← Back to Index
hive-hwde (Hive-RSI-Lab)ECADConfidence: Medium

The isolation barrier check audits the gap after copper exists, but nothing upstream knows about it. The rules generator writes high-voltage DRC rules from creepage voltages and nothing from the isolation constraint, so routers and pours walk into the gap and the board finds out at final verify. One design keeps its 8 mm gaps with hand-placed keepouts in its own layout code. The ask is one source that DRC, routers and pours all read.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 31-Nov 1 2026 (Oct 31 9:41 PM ET through Nov 1 7:41 AM ET digests plus the Haitch overnight edition). Verified live 2026-11-01: issue/PR read; title and state confirmed.