← Back to Index
hive-hwde (Hive-RSI-Lab)ECADConfidence: Medium

On a LISN rev 2 board, eight inductors (Wurth 744325120, LCSC C1331072) have no EasyEDA model, so the placement check can never verify their rotation. "hwde gate" applies the DFM waiver and reports pass with 8 waived. "attest build" then reports 8 failing, because it only honours waivers from a different tool and a different file. The author says the refusal is the honest answer, since nobody has checked the rotation, and asks for either a hand-recorded fact with its own evidence, such as the rotation read from JLC's placement preview, or a gate that refuses waivers attest won't honour.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.