← Back to Index
hive-hwde (Hive-RSI-Lab)ECADConfidence: Medium

On a mains PSU board, bulk sat on T1's dotted primary pin and D5's anode on the dotted secondary pin. That makes it a forward converter, so VDD heads to about 103 V against the controller's 38 V limit. "erc, verify, verify_release and attest build all passed. An independent cold review found it by reading the Würth drawing and TI's reference schematic pin by pin." The same review found the 12 V winding on the wrong pins (5 turns instead of 7). The ask is for transformer symbols to carry dots and a turns table, and for a check that compares wiring with the declared topology.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.