← Back to Index
hive-hwde (Hive-RSI-Lab)ECADConfidence: Medium

Two false losses on the same Altium crossover board: the export check called 59 parts lost from the ODB++, but all were board-only items like the frame, logos and silk labels, and with PR #562 the model path check flagged all 8 embedded 3D models as unanchored and failed verification, though the models travel inside the board.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 31-Nov 1 2026 (Oct 31 9:41 PM ET through Nov 1 7:41 AM ET digests plus the Haitch overnight edition). Verified live 2026-11-01: issue/PR read; title and state confirmed.