A 0201 land with reduced paste has two unnumbered paste-only pads. cpl_verify counted them as pads, so every bottom-side 0201 failed as "more than two pads" and the DFM gate blocked 19 of 22 parts. Fixed with a new test case. Last hour this repo's gate passed things it shouldn't. This hour it blocked things it should have passed.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.