A post-route pour-completion step adds GND and +3.3V vias and traces without ever reading the voltage map, with measured gaps including 0.400 mm where 1.60 mm was required next to a 150 V net, and the run ends with no warning.
From the Grok pain-radar digests, Oct 27-28 2026 (Oct 27 8:41 AM ET through Oct 28 7:41 AM ET digests plus the Haitch editions). Verified live 2026-10-28: issue/PR/thread read; title and state confirmed.