KiCadRoutingTools, a chained autorouting flow. route_diff.py connects the USB D+/D- pair single-ended but records no protection for it. The next step, route.py, rips both nets as "pre-existing", never reroutes them, skips the restore because the old copper would now short, and the improvement gate logs "this run broke 2 previously-connected net(s) [D+, D-] ... ACCEPTED". The board ships with D+, D-, SDA and SWDIO open. One step's knowledge didn't reach the next step.

Wrong verdict reported against KiCadRoutingTools (drandyhaas)

KiCadRoutingTools (drandyhaas)Electronics & PCBWrong verdictMedium confidence

What engineers report

A wrong verdict reported against KiCadRoutingTools (drandyhaas): a check, review or gate reports pass or fail incorrectly.

Recorded mode: agent / false pass

Analyst note

From the Grok pain-radar digests, Nov 22-23 2026 (Nov 22 8:41 AM ET through Nov 23 7:41 AM ET digests). Verified live 2026-11-23: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to KiCadRoutingTools (drandyhaas).

Evidence

  1. 1drandyhaas/KiCadRoutingTools Issue #2044: route.py: an all-nets step rips a pair route_diff.py connected single-ended as electrically short, skips its restore, and the improvement gate accepts the open pairgithub.com

More recurring errors in KiCadRoutingTools (drandyhaas)

See all 72 KiCadRoutingTools (drandyhaas) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.