KiCadRoutingTools (drandyhaas)ECADConfidence: Medium

The router pinned board-edge clearance to the 0.2 mm fab floor but its plane check refilled under the old 0.05 mm rule, reported GND complete, skipped the strap, and the shipped pour was split in two.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digest, Oct 24-25 2026 (Oct 24 evening to Oct 25 morning slots). Verified live 2026-10-25: issue/PR read on GitHub; title and state confirmed.