An agent-driven router placed a GND plane-tap via dead centre in the USB plug's GND contact finger: the mating surface that slides into the socket. A drilled hole there damages the plating the socket wipes against, and nothing graded it: check_drc sees a same-net via in a same-net pad as legal copper, check_assembly said buildable, and board_score reached blocking 0, so the defect shipped with every grader clean.
Wrong verdict reported against KiCadRoutingTools (KiCad MCP routing skill)
What engineers report
A wrong verdict reported against KiCadRoutingTools (KiCad MCP routing skill): a check, review or gate reports pass or fail incorrectly.
Recorded mode: agent / verification gap
Analyst note
From the Grok Haitch pain-radar compilation, finding 19, found 2026-10-02, score 9/10. Verbatim evidence: "Run 39 reached board_score blocking 0 with no hand moves, and this defect shipped on that board with every grader clean." Cost model assumes the connector is replaced on the prototype run or the board respun after mating damage.
What it costs a team
Modeled annual cost
$24,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
360 min
Per engineer per month, about 1 incidents
How the cost is modeled
360 min/month × 5 engineers × 12 months = 360 hours × $67/hour = $24,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
Evidence
More recurring errors in KiCadRoutingTools (KiCad MCP routing skill)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.