A PCB placement solver driven by a real agent through a 246-step session ended with no unmet constraints and refs still unplaced, wasting two full solve runs: one had a region rectangle 0.1 mm too short for any grid point, the other a 6x6 mm corner the grid could not hit, and the caller could only find out by re-running with relaxed inputs.
Silent failure reported against Net2Board (co-naut)
What engineers report
A silent failure reported against Net2Board (co-naut): reports success, or uses stale data, while the result is wrong or missing.
Recorded mode: agent / silent failure
Analyst note
From the Grok pain-radar digest, Oct 25-26 2026 (Oct 25 daytime to Oct 26 morning slots). Verified live 2026-10-26: issue/PR read on GitHub; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to Net2Board (co-naut).
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.