← Back to Index
node60-hw (karlTbowers)ECADConfidence: Medium

A library submodule bump gives a capacitor a new description, and it has to be written into the placed symbols and into each sheet's cached copy before ERC stops flagging lib_symbol_mismatch. Locally ERC still shows 108 label_dangling errors that CI on main does not, and the author guesses it is a local difference.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 1-2 2026 (Nov 1 8:41 AM ET through Nov 2 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-02: issue/PR read; title and state confirmed.