OpenROAD (The-OpenROAD-Project)ECADConfidence: Medium

Since a change merged Oct 24, detailed_route starts at iteration 3 when DRC markers exist, skipping iterations 0-2 that route nets with guides but no wires; in an ECO flow after repair_design or repair_antennas, ripped-up nets are never routed while the command "reports 0 violations and returns normally".

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digest, Oct 25-26 2026 (Oct 25 daytime to Oct 26 morning slots). Verified live 2026-10-26: issue/PR read on GitHub; title and state confirmed.