← Back to Index
PSDR (MichaelRColton)ECADConfidence: Medium

An outside reader compared main.c with the 2.6.1 board netlist. Of seven signal paths, three have code, and the two VNA cases are empty even though the bridge, the AD8302 and the switch pins are all routed. A plug-in filter bank is "accounted for in hardware and no code path ever selects it." The maintainer said back in 2021 that most of his code isn't on main. #20 is a duplicate post.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.