← Back to Index
ecc (openecos-projects)ECADConfidence: Medium

An open chip flow ran Yosys on a 2.8 million cell design; the two gzip netlists the next steps read came out 20 bytes each and empty. Yosys exited 0, post-synthesis timing failed with "input contains no modules", and the flow still recorded Synthesis as Success.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digest, Oct 20 2026 (7:41 AM to 9:41 AM ET slots). Verified live 2026-10-21: issue/PR read on GitHub; title and state confirmed.