The MCP bridge reported success with empty content for symbol and multi-path variable reads, and reported code verified when every PLC project was skipped.

Silent failure reported against AI-TwinCAT-Skill (Lance0901)

AI-TwinCAT-Skill (Lance0901)Embedded & firmwareSilent failureMedium confidence2 tools help

What engineers report

A silent failure reported against AI-TwinCAT-Skill (Lance0901): reports success, or uses stale data, while the result is wrong or missing.

Recorded mode: agent / silent failure

Analyst note

From the Grok pain-radar digest, Oct 26 2026 (8:41 AM to 11:41 AM ET digests plus Haitch morning edition). Verified live 2026-10-26: issue/PR/thread read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

Evidence

  1. 1Lance0901/AI-TwinCAT-Skill PR #59: fix: MCP array data no longer eaten; codeVerified not true when all PLC projects skippedgithub.com

More recurring errors in AI-TwinCAT-Skill (Lance0901)

See all 2 AI-TwinCAT-Skill (Lance0901) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.