First physical run on a NUCLEO-H723ZG asked for ADC_ACQ_TIME_DEFAULT, which the STM32 driver reads as the shortest window, so three ADC3 inputs sagged as voltage rose (A4 read 214 mV low at 3.2 V) and five ADC1 inputs read ~35 mV high, yet all tests passed because everything sat inside the old 150 mV tolerance.
Silent failure reported against zephyr-nucleo-h723zg-example (amahpour)
What engineers report
A silent failure reported against zephyr-nucleo-h723zg-example (amahpour): reports success, or uses stale data, while the result is wrong or missing.
Recorded mode: agent / silent failure
Analyst note
From the Grok pain-radar digest, Oct 25-26 2026 (Oct 25 daytime to Oct 26 morning slots). Verified live 2026-10-26: issue/PR read on GitHub; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.