Firmware assumed one IS resistor per IBT-2 while the schematic puts two in parallel, so current read about half the real value and a 20 A limit really sat near 40 A; KiCad ERC was clean throughout.
Wrong verdict reported against RideOnESP32 (ShaiMiz)
What engineers report
A wrong verdict reported against RideOnESP32 (ShaiMiz): a check, review or gate reports pass or fail incorrectly.
Recorded mode: agent / verification gap
Analyst note
From the Grok pain-radar digest, Oct 24-25 2026 (Oct 24 evening to Oct 25 morning slots). Verified live 2026-10-25: issue/PR read on GitHub; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
Evidence
More recurring errors in RideOnESP32 (ShaiMiz)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.