A DXF importer copied a rough 2 mm contour match into manufacturing identity, so two valid doors 1 to 2 mm apart could swap order-row identities and fail the strict cut check.

Silent failure reported against almdina-erp (Hasan-Alhendi)

almdina-erp (Hasan-Alhendi)MechanicalSilent failureMedium confidence2 tools help

What engineers report

A silent failure reported against almdina-erp (Hasan-Alhendi): reports success, or uses stale data, while the result is wrong or missing.

Recorded mode: agent / silent data corruption

Analyst note

From the Grok pain-radar digest, Oct 24-25 2026 (Oct 24 evening to Oct 25 morning slots). Verified live 2026-10-25: issue/PR read on GitHub; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

Evidence

  1. 1Hasan-Alhendi/almdina-erp PR #555: fix(dxf): separate manufacturing identity from topology tolerancegithub.com

More recurring errors in almdina-erp (Hasan-Alhendi)

See all 2 almdina-erp (Hasan-Alhendi) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.