← Back to Index
BIMCraft (IPedrax)MCADConfidence: Medium

A room separation line snapped wall face to wall face closed nothing when rooms were measured at wall centre lines; its ends stopped half a wall short, so each room on either side reported the whole open space in the room list, in schedules, and in the IFC GrossFloorArea. The Revit import's room matching used the same code path.

Impact Analysis

Persona
Mechanical Designer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 28-29 2026 (Oct 28 8:41 AM ET through Oct 29 early-morning Haitch editions). Verified live 2026-10-29: issue/PR read; title and state confirmed.