Coordinate_support (Celeritas7)MCADConfidence: Medium
A pipe-routing tool measured each bend face as the full torus ring, so pipe 111 read as up to 5.6 mm into pipe 211 at six places where centrelines are 13 to 29 mm clear, and only one clash was real.
From the Grok pain-radar digests, Nov 1-2 2026 (Nov 1 8:41 AM ET through Nov 2 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-02: issue/PR read; title and state confirmed.