A text-to-device CAD agent's robot-arm run failed on a rule from its single-box era: every part needs an assembled position. The code it ran was an old saved spec, rebuilt with no model involved because a failed, never-saved draft had marked saved work stale. An audit found more single-box rules blocking multi-part designs.
Silent failure reported against ditto (bryanz35)
What engineers report
A silent failure reported against ditto (bryanz35): reports success, or uses stale data, while the result is wrong or missing.
Recorded mode: agent / failure
Analyst note
From the Grok pain-radar digests, Nov 14-15 2026 (Nov 14 8:41 PM ET through Nov 15 1:41 AM ET digests plus the Haitch edition). Verified live 2026-11-15: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to ditto (bryanz35).
Evidence
More recurring errors in ditto (bryanz35)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.