SolidWorks automation could create a groove sketch with no successful cut, so a shaft keyway looked done and was not; the fix compares real volume removed against the analytic groove volume and rejects zero removal.

Silent failure reported against gokworks (gkkizil)

gokworks (gkkizil)MechanicalSilent failureMedium confidence

What engineers report

A silent failure reported against gokworks (gkkizil): reports success, or uses stale data, while the result is wrong or missing.

Recorded mode: agent / false success

Analyst note

From the Grok pain-radar digest, Oct 25-26 2026 (Oct 25 daytime to Oct 26 morning slots). Verified live 2026-10-26: issue/PR read on GitHub; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to gokworks (gkkizil).

Evidence

  1. 1gkkizil/gokworks PR #8: Stabilize shaft groove/keyway cuts and radius constraintsgithub.com

More recurring errors in gokworks (gkkizil)

See all 3 gokworks (gkkizil) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.