DWG to PVEC conversion keeps TEXT and MTEXT but drops DIMENSION, MULTILEADER and TOLERANCE text. The plan viewer shows linework with none of the dimension values. Found while building a zoom sweep in a downstream viewer.
Import, export & interop reported against libviprs (libviprs)
What engineers report
A import, export & interop reported against libviprs (libviprs): breaks when reading, writing or converting files and data between tools.
Recorded mode: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 22-23 2026 (Nov 22 8:41 AM ET through Nov 23 7:41 AM ET digests). Verified live 2026-11-23: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to libviprs (libviprs).
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.