A CAD body agent burned all 60 steps on a rule whose failure message said '93% flat, needs 93%' with no location. The real value was 92.98%, and the message repeated the same fix the agent was already trying. After the change the same design passed that rule at step 18 instead of never.

Wrong verdict reported against Makeable.build (Makeable-inc)

Makeable.build (Makeable-inc)MechanicalWrong verdictMedium confidence

What engineers report

A wrong verdict reported against Makeable.build (Makeable-inc): a check, review or gate reports pass or fail incorrectly.

Recorded mode: agent / failure

Analyst note

From the Grok pain-radar digests, Nov 10-11 2026 (Nov 10 8:41 AM ET through Nov 11 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-11: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to Makeable.build (Makeable-inc).

Evidence

  1. 1Makeable-inc/Makeable.build PR #65: Agent messages say where and by how much; texture step on every jobgithub.com

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.