← Back to Index
Open-Infra-Studio (OpenAEC-Foundation)MCADConfidence: Medium

The civil IFC export sampled ground level only at the corridor mesh corners, so peaks and dips between design points vanished. A 10 x 10 m test reported 200 m3 of fill where the right answer is 166.67 m3, and in one case missed 4.17 m3 of cut entirely. PR #53 is in Dutch.

Impact Analysis

Persona
Mechanical Designer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.