← Back to Index
openarm_description (enactic)MCADConfidence: Medium

The V2 pedestal, link1 and link6 collision meshes needed repair, and the link4 collider did not cover the cable covers, so the simulated arm collision model and the physical arm disagreed.

Impact Analysis

Persona
Mechanical Designer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 1-2 2026 (Nov 1 8:41 AM ET through Nov 2 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-02: issue/PR read; title and state confirmed.