A paying user cannot import a STEP from Plasticity: the reader rejects the whole body if any spline edge endpoint is more than 1e-5 mm off its curve while ignoring the file's declared 1e-3 mm tolerance; 54 of 538 edges fail, 14 over the file's own tolerance, max gap 7e-3 mm.
Wrong design output reported against PaliCAD (braydennilsen)
What engineers report
A wrong design output reported against PaliCAD (braydennilsen): produces incorrect geometry, routing, values or parts.
Recorded mode: silent wrong geometry
Analyst note
From the Grok pain-radar digest, Oct 25-26 2026 (Oct 25 daytime to Oct 26 morning slots). Verified live 2026-10-26: issue/PR read on GitHub; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.