A real office fit-out plan said "1:100 @ A3" in its title block but was drawn at 1:50; taking off at the printed scale doubles every length and quadruples every area, and nothing caught it because the scale check only compared the title block with itself.

Wrong verdict reported against pdf2takeoff (ajflow)

pdf2takeoff (ajflow)MechanicalWrong verdictMedium confidence1 tool help

What engineers report

A wrong verdict reported against pdf2takeoff (ajflow): a check, review or gate reports pass or fail incorrectly.

Recorded mode: agent / verification gap

Analyst note

From the Grok pain-radar digest, Oct 25-26 2026 (Oct 25 daytime to Oct 26 morning slots). Verified live 2026-10-26: issue/PR read on GitHub; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

Evidence

  1. 1ajflow/pdf2takeoff PR #37: Catch a mislabelled sheet: check the scale against its printed dimensionsgithub.com

More recurring errors in pdf2takeoff (ajflow)

See all 2 pdf2takeoff (ajflow) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.