SolidCraft RFC on manufacturing intent. The author's words: "anything I want a slicer to do differently in one part of a model lives outside the design." Infill zones mean splitting bodies and remembering which gets what. Filament per region, support enforcers and blockers, sacrificial bridge layers. "Every re-export means doing it again by hand in the slicer." Proposal is intent objects attached to named faces and bodies so they survive edits, then handed to whatever slicer, CAM or laser tool you already use.

Missing capability reported against solidcraft (tangency-labs)

solidcraft (tangency-labs)MechanicalMissing capabilityMedium confidence

What engineers report

A missing capability reported against solidcraft (tangency-labs): cannot do a step the workflow needs, so people fill the gap by hand.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 22-23 2026 (Nov 22 8:41 AM ET through Nov 23 7:41 AM ET digests). Verified live 2026-11-23: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to solidcraft (tangency-labs).

Evidence

  1. 1tangency-labs/solidcraft Issue #21070: RFC: Manufacturing intent in the design for any process, starting with export to your slicergithub.com

More recurring errors in solidcraft (tangency-labs)

See all 54 solidcraft (tangency-labs) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.