Support walls were only checked with probes inside the part, so in a recessed box the last probe landed on the end wall's face outside the part, passed, and the wall was built flush against the end wall where it welds (30 support vertices at 0 mm).
From the Grok pain-radar digests, Oct 26-27 2026 (Oct 26 12:41 PM ET through Oct 27 7:41 AM ET digests plus the Haitch editions). Verified live 2026-10-27: issue/PR/thread read; title and state confirmed.