The TwinCAT MCP server's XAE calls compared nothing about which solution the attached shell had open: when the user closed one project and opened another machine's project in a second shell, the dead proxy re-attached to whatever came first and edited the other machine's PLC project. The backend now binds the solution and checks it before every call.
Data loss or unsafe action reported against twincat-mcp-server (Disectron)
What engineers report
A data loss or unsafe action reported against twincat-mcp-server (Disectron): destroys work, overwrites data, runs away or acts unsafely on hardware.
Recorded mode: agent / destructive side effects
Analyst note
From the Grok Haitch pain-radar digest, Oct 20 2026. Verified live 2026-10-20: PR read; the wrong-project edit is the top-severity item from the retest, with the fix described in the PR body.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to twincat-mcp-server (Disectron).
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.