An Onshape-connected parts list showed a $0.00 total BOM cost because parts with no unit cost counted as free, a total that looks finished enough to go straight into a quote.

Silent failure reported against control-point (ZOGWORK)

control-point (ZOGWORK)PLM & dataSilent failureMedium confidence

What engineers report

A silent failure reported against control-point (ZOGWORK): reports success, or uses stale data, while the result is wrong or missing.

Recorded mode: agent / false success

Analyst note

From the Grok pain-radar digest, Oct 24-25 2026 (Oct 24 evening to Oct 25 morning slots). Verified live 2026-10-25: issue/PR read on GitHub; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to control-point (ZOGWORK).

Evidence

  1. 1ZOGWORK/control-point PR #333: Control Kit promo and CAD remodel: Parts list second, honest BOM totalsgithub.com

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.