A window U-factor (ThermalTransmittance 1.70348) was returned with no unit because the reader only reported length, area and volume units.

Import, export & interop reported against flo2-ifc (flo2-connector)

flo2-ifc (flo2-connector)PLM & dataImport, export & interopMedium confidence

What engineers report

A import, export & interop reported against flo2-ifc (flo2-connector): breaks when reading, writing or converting files and data between tools.

Recorded mode: validation / interop

Analyst note

From the Grok pain-radar digests, Oct 26-27 2026 (Oct 26 12:41 PM ET through Oct 27 7:41 AM ET digests plus the Haitch editions). Verified live 2026-10-27: issue/PR/thread read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to flo2-ifc (flo2-connector).

Evidence

  1. 1flo2-connector/flo2-ifc PR #14: Every unit, each value's unit, and one name for one thing across the tools (0.9.0)github.com

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.