The microscope project now writes cables.csv from the CAD build, 42 cables with ends, conductors, routes, cut lengths and, for power, peak current, fuse and voltage drop. Moving ends are measured at their longest across travel. It is a workaround people build when the harness and the mechanical model live in different tools.
From the Grok pain-radar digests, Nov 1-2 2026 (Nov 1 8:41 AM ET through Nov 2 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-02: issue/PR read; title and state confirmed.