← Back to Index
Onshape-Lunaparts-Coallition (1piemanpie)PLMConfidence: Medium

Follow-up to last hour's #45/#46. After the title fix, the drawing number box still showed "----" because it "seems to read the drawing tab's own Part number property, not the part's" (#52). #53 answers how a drawing fixed in Onshape gets back into LUNA. "Until now, the only way was to attach the file by hand in LUNA." It adds an UPDATE FILES button that uploads the next revision. A HISTORY tab was added in #50 and removed in #51 within 15 minutes. Neither #52 nor #53 was tested against real Onshape or LUNA.

Impact Analysis

Persona
Product Manager
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Nov 2 2026 (Nov 2 8:41 AM ET through Nov 2 10:41 PM ET digests plus the Haitch editions). Verified live 2026-11-03: issue/PR read; title and state confirmed.